Installation Overview At a prominent confectionery site in York, Newsome has installed a high-capacity 400 kW chiller, marking the timely realisation of the project. Designed to advance ESG targets, the installation boosts system dependability while minimising overall power consumption and CO₂ levels. https://minibookmarks.com/story20687343/energy-efficient-400-kw-chiller-installation-achieves-50-000-yearly-energy-savings-and-200-metric-tonnes-co%E2%82%82-reduction